Pro Contractor / Builder · Cornerstone feature
BYOB Design Center & Architectural Center
Run selections and approvals with your client, and mark up plans in the field — every choice tied to a milestone and every dollar counted in whole cents. Interactive preview with sample data.
Drag to move around the sheet. Use + and − to zoom.
Homeowner approvals
One click approves a milestone’s selections and clears it for work.
0 of 4 milestones approved
- 1. FramingAwaiting approval
- 2. Rough-inAwaiting approval
- 3. DrywallAwaiting approval
- 4. FinishesAwaiting approval
Client selection portal
Finishes are grouped by the milestone they’re installed at and priced against the contract allowance.
Milestone 1 · Framing
Awaiting approvalMilestone 2 · Rough-in
Awaiting approvalMilestone 3 · Drywall
Awaiting approvalMilestone 4 · Finishes
Awaiting approvalBudget rollup
| Milestone | Allowance | Selected | Variance |
|---|---|---|---|
| Framing | 19,000.00 CA$ | 18,400.00 CA$ | −600.00 CA$ |
| Rough-in | 1,440.00 CA$ | 1,080.00 CA$ | −360.00 CA$ |
| Drywall | 7,650.00 CA$ | 7,140.00 CA$ | −510.00 CA$ |
| Finishes | 18,970.00 CA$ | 13,686.00 CA$ | −5,284.00 CA$ |
| Subtotal | 47,060.00 CA$ | 40,306.00 CA$ | −6,754.00 CA$ |
| GST (5%) | 2,015.30 CA$ | ||
| Total | 42,321.30 CA$ | ||
Sample Calgary pricing for illustration, not a quote. Totals are calculated in whole cents.
Blueprint reader
Drop a PDF or CAD file here
PDF, DWG or DXF, up to 4 MB.
The file is checked and discarded right away — nothing is stored.
Extracted metrics
SimulatedSample plan — upload a file to replace it.
- Total floor area
- 1,120 sq ft
- Exterior perimeter
- 136 LF
- Walls
- 15
- Interior walls
- 148 LF
Detected trade scopes
- Framing
- Electrical
- Flooring
- HVAC
- Plumbing
- Drywall
Preview: AI parsing isn’t connected yet, so these metrics are sample values generated from your file. The file type and PDF page count are real.
Material takeoff
Choose the structural elements; quantities and costs update from the blueprint metrics.
| Line item | Quantity | Unit price | Total |
|---|---|---|---|
| Walls — Wood 2×4 framing136 LF × 9 ft + 148 LF × 9 ft × 2 sides = 3,888 sq ft | 3,888 sq ft | 3.60 CA$ | 13,996.80 CA$ |
| Flooring — LVP1,120 sq ft + 10% waste = 1,232 sq ft | 1,232 sq ft | 5.25 CA$ | 6,468.00 CA$ |
| Ceilings — Smooth drywall1,120 sq ft of floor area | 1,120 sq ft | 3.40 CA$ | 3,808.00 CA$ |
| Electrical rough-in1,120 sq ft of floor area | 1,120 sq ft | 6.50 CA$ | 7,280.00 CA$ |
| Plumbing rough-in1,120 sq ft of floor area | 1,120 sq ft | 4.75 CA$ | 5,320.00 CA$ |
| HVAC rough-in1,120 sq ft of floor area | 1,120 sq ft | 5.25 CA$ | 5,880.00 CA$ |
| Subtotal | 42,752.80 CA$ | ||
| GST (5%) | 2,137.64 CA$ | ||
| Total | 44,890.44 CA$ |
Sample Calgary unit pricing for illustration, not a quote. Quantities round up to whole units; totals are calculated in whole cents.
Sub-trade scope dispatcher
Slice the takeoff into trade scopes and send each one out as a bid request.
- Framing13,997 CA$ · 1 line itemNot dispatched
- Electrical7,280 CA$ · 1 line itemNot dispatched
- Flooring6,468 CA$ · 1 line itemNot dispatched
- HVAC5,880 CA$ · 1 line itemNot dispatched
- Plumbing5,320 CA$ · 1 line itemNot dispatched
- Drywall3,808 CA$ · 1 line itemNot dispatched
Preview: sub-trades are samples and no requests are sent. In the app, bid requests go to the Handyman / Sub-trade accounts connected to your projects.
Coming to the Design Center
- جولات ثلاثية الأبعاد في النموذجقريبًا
- القياس المكاني بالذكاء الاصطناعيقريبًا
- مزامنة كتالوج الموردين عبر APIقريبًا
- تحليل المخططات بالذكاء الاصطناعيقريبًا
- Automated sub-trade bid dispatchقريبًا
- Automated CAD 3D layout renderingقريبًا